Why Contractors Hesitate to Bring in a CFO
Picture a contractor who has just agreed to bring on a fractional CFO for construction companies.
It is Monday morning, two jobs are waiting on draws, payroll goes out Friday, and one of his project managers needs an answer on a change order. In the middle of all that, he realizes someone new is about to start asking questions about his books, and he wonders how much of his week it will take.
That concern is understandable.
The finance side of the business matters, but the jobs, the crews, and the payroll cannot wait while someone gets up to speed. This post walks through the first 90 days in order, so you can see what to expect before you commit to anything.
Your Jobs Keep Running
A good onboarding is built around your operations. Billing, payroll, and payables continue on their normal schedule from the first day.
Nothing gets paused while we get started.
We usually do not replace your accounting software at the start, and your bookkeeper keeps doing the job they were already doing, with us working alongside them.
Your project managers stay on the jobs.
They spend a little time with us each week in scheduled check-ins rather than long meetings.
Days 1 to 30: Learning Where You Stand
The first month is spent learning where the company actually stands.
We access your accounting system, your bank accounts, and your payroll reports, along with your current job list showing contract values, costs to date, and amounts billed. We also sit down with you, your project managers, and your bookkeeper to understand how money moves through the business.
The way a company really operates is often different from what the reports suggest.
From there we compare the profit on your financial statements to the cash in your bank account, since cash flow and profit are two different things and the gap in construction can be large. We check which jobs are holding their margin and which are showing margin fade. We also look at how much cash is tied up in receivables and retainage.
These are the answers most owners do not have yet.
If the books need cleanup, it starts here. Reconciliations get caught up, costs get coded to the right jobs, and anything else that makes the numbers unreliable gets corrected.
Cleanup is part of the first month.
By the end of it you receive a plain-language summary of where the company stands, along with a short list of priorities for the next two months.
Days 31 to 60: Building the Reports
Once the numbers can be trusted, the second month goes to building the reports you will rely on. The first is a work-in-progress (WIP) report, built on accurate job costing, which shows where each job stands and lets you see which of your projects are profitable while there is still time to change something.
Two more reports build on that foundation.
The second is a cash forecast that looks ahead several weeks, so a shortfall shows up before the bills come due. The third is a monthly financial package with a profit and loss statement, a balance sheet, and a cash flow statement that arrives on a set schedule and is written to be readable.
Each of these reports takes the place of a question you used to answer from instinct.
This is also when we begin meeting regularly with your project managers. They know what is happening in the field, and our job is to translate that into numbers you can act on.
Days 61 to 90: Settling Into a Routine
In the third month the work shifts from building to running. A routine takes shape, with a regular cash meeting with your leadership team, a monthly job review with your project managers, and a monthly financial review with you.
By this point the reports are in regular use.
We also prepare your reporting for the people who ask for it. If you work with a surety, a bank, or outside investors, the goal is to be able to hand over clean numbers quickly instead of pulling them together under pressure.
Then we look ahead to the next quarter.
We lay out priorities for that period, which might include pricing, overhead, bidding margins, or cash targets, depending on what we found.
That is the goal of the first 90 days.
By day 90 you should be able to see, without calling anyone, whether each active job is holding its margin, roughly how much cash the company will have over the coming weeks, and whether there is room to take on the next large project.
What We Need From You
The engagement goes best when you stay involved.
We need one person on your side who can answer questions quickly, such as when an invoice needs explaining or a job needs context. We also need access to your accounting system, bank, and payroll reports, so we are working from the real picture.
Every company has messy parts, and that is fine.
We need to be open about them, because they are easier to fix once they are on the table. Shadows in closets are far less intimidating once we shine a light on them.
And we need responsiveness.
If we delay meetings or action items then all the best advice in the world will have no effect on your business.
If Your Books Are Messy
Many contractors who bring in a CFO have books that are behind or inconsistent. That does not hold up the process, since cleanup is built into the first month.
You do not need clean books to get started.
We tell you what we find, what it will take to fix, and how it affects the timeline, so you can plan around it.
What This Looked Like for One Client
The plan above is what a typical onboarding looks like. In practice, every client is unique, and we work with you where you are.
Sometimes where you are is a cash crisis that needs to be solved right now.
In my post on when to hire a construction CFO, I described a commercial contractor who waited a year before bringing someone on. By the time we started, he had only months before the company ran out of cash.
That changed the order of things.
Every week we met with his leadership team and project managers to plan and manage cash, so everything could keep running. At the same time, we cleaned up his books, built a proper WIP report, set up a rolling cash flow forecast, and put financial processes in place.
All of it happened side by side.
We got him through the crisis and built up three months of cash runway. That gave him room to focus on the future, and the foundation to keep the company from ending up in that position again.
His jobs kept running the whole time.
Cost and Timing
If you want to see the numbers, I wrote a guide on what a construction CFO costs, full-time versus fractional.
If you are still deciding whether the timing is right, there is a post for that as well.
It lays out five signs it is time to hire a construction CFO.
Talk to Us
A construction CFO should make your operations run more smoothly, and the first 90 days are designed with that in mind.
The best next step is a conversation.
Bring your most recent financial statements and your current job list, and we will walk through what the first 90 days would look like for your company. You will leave knowing what is missing, whether or not you decide to work with us.